San Javier April 2022 Infrastructure Advantages
These pictures and videos were taken during a site visit to San Javier during in April 2022.
Canuc’s San Javier Project has significant infrastructure advantages.
An abandoned Mill, which was built by the Sonora government in the 1990’s, is located on Canuc’s San Javier Fracc. 2 and Orion 3 claims. Canuc purchased the San Javier Fracc. 2 and Orion 3 claims in January of 2021.
This abandoned Mill located on Canuc’s claims represents an infrastructure advantage that is accretive to permitting and development timelines.
Gallery
Videos
San Javier Links
IOCG Discovery at San Javier Oct.2006 – Sep.2020
Silver-dominant IOCG Jan.2021
Silver-dominant IOCG Apr.2021
Building a Mine at San Javier Sep.1990 - Apr.2022
Infrastructure Advantages at San Javier Apr.2022
